# Microsoft publishes review of Azure gateway control plane failure

Facts read 16 Nov 2026. Page reviewed 16 Nov 2026.

Microsoft's post incident review for 30 September 2026 says gateway updates resumed across many regions at once and overwhelmed a regional networking control plane. Management operations failed intermittently from 20:30 UTC on 30 September to 02:15 UTC on 1 October 2026 across more than thirty regions.

The review names Azure ExpressRoute Gateway, Application Gateway, Firewall, Bastion, Virtual WAN and VPN Gateway among the affected services, and says some upgraded ExpressRoute gateways temporarily lost connectivity.

Microsoft states that a temporary deployment restriction expired, letting a large number of gateway updates resume within a short period, while an earlier change had lengthened configuration processing time on a shared control plane service.

The recovery step was a rollback of that earlier change, started at 01:15 UTC on 1 October 2026. Microsoft lists work to make paused updates resume in staged rollouts. The review describes an availability incident.

## Related pages

- [Microsoft publishes review of Azure OpenAI Sweden Central outage](/news/azure-openai-sweden-central-pir/)
- [Astrana Health files Item 1.05 after social engineering attempts](/news/astrana-health-social-engineering/)
- [Nutex Health says the third party published the data](/news/nutex-health-data-published/)
- [All of them](/news/)

## Sources

- https://azure.status.microsoft/en-us/status/history/ (read 16 Nov 2026)

Last reviewed 16 Nov 2026. Canonical: https://cloudsecuritybreaches.com/news/azure-gateway-control-plane-pir/
